一、个人简介
关旭,男,汉族,1984年7月生,湖北武汉人。2013年7月毕业于华中科技大学管理学院获博士学位,现任职于www.365808.com管理科学与工程系。
二、教育经历
2007.09-2013.06 华中科技大学 管理学院 管理科学与工程专业 博士
2011.08-2013.03 加州大学伯克利分校 工程学院 工业工程与运筹系 联合培养博士研究生
2003.09-2007.06 华中科技大学 管理学院 管理科学与工程 本科
三、研究方向
运营与市场结合(Operation and marketing interface);竞争策略(Competitive strategy);博弈论(Game theory);装配系统(Assembly system)。
四、学术研究
发表论文:
[1] Xu Guan, Ying-Ju Chen. Interplay between information acquisition and quality disclosure. Forthcoming in Production and Operation Management.
[2] Xu Guan, Ying-ju Chen. Timing of information acquisition in a competitive environment. Naval Research Logistics,2016, 63(1), 3-22.
[3] Xu Guan, Guo Li, S.P. Sethi. Inventory control policy in a decentralized assembly system: the role of vendor inventory liability period. International Journal of Production Research, 2016, 54(17):5029-5044
[4] Guo Li, Lijun Zhang, Xu Guan (corresponding author). The impact of decision sequence on reliability enhancement with supply disruption risks. Transportation Research Part E,2016, 90,25-38.
[5] Guo Li, Lin Li, Ying Zhou, Xu Guan (corresponding author), Capacity restoration in a decentralized assembly system with supply disruption risks, International Transactions in Operational Research, accepted and forthcoming.
[6] lv fei, Shihua Ma, Xu Guan (corresponding author). The implication of capacity reservation contracts in assembly system with asymmetric demand information. International Journal of Production Research, 2015, 53(18), 5564-5591.
[7] Xu Guan, Ying-ju Chen. Hierarchical information disclosure in a supply chain. Decision Support System, 2015, 76, 63-75.
[8] Guo Li, Meng-qi Liu, Xu Guan (corresponding author). The impact of payment contracts diversity in a decentralized assembly system. Annals of operational research, accepted and forthcoming.
[9] Guo Li, Xu Guan (corresponding author). The impact of decision timing on the suppliers’ interactions: simultaneous moves vs sequential moves. Journal of Operational Research Society,2016, 67(2), 248-258
[10] Xu Guan, Guo Li, Zhe Yin. The implication of time-based payment contract in the decentralized assembly system, Annals of operational research, 2016, 240(2), 641-659.
[11] Xu Guan, Shi-hua Ma, Zhe Yin. The impact of hybrid push-pull contract in a decentralized assembly system,Omega-International Journal of Management Science, 2015, 50, 70–81.
[12] Shi-hua MA, Zhe Yin, Xu Guan (corresponding author). The role of spot market in a decentralized supply chain under random yield, International Journal of Production Research, 2013.51(21).
[13] 王先甲,张柳波,关旭,肖露. 道德风险模型中代理人公平敏感性对契约影响[J].管理科学学报, 2016.08
[14] 王先甲,肖露,关旭. 非对称供应成本信息下装配系统定价与供货策略研究[J].系统工程理论与实践, 2015.07
[15] 关旭,马士华,肖庆. 两种运作模式下加工-装配式供应链响应性比较分析[J].管理学报,2015.12
[16] 关旭,马士华,应丹丰.不确定条件下基于库存责任期的装配系统优化决策研究[J].系统工程理论与实践, 2013.33(9)
[17] 关旭,马士华,应丹丰. 基于库存分担策略的多供应商对单制造商准时供货模型研究,中国管理科学, 2013,21(4)
[18] 关旭,马士华,桂华明. 基于资金流服务商的供应链资金运作能力研究[J].管理评论, 2012.01
[19] 关旭,马士华,应丹丰.随机提前期下基于多重结算方式的装配系统协同问题研究[J].管理科学学报, 2011.06
[20] 关旭,马士华,周奇超. 要货时间不确定下的多供应商配套供货模型研究[J].中国管理科学, 2011.02
[21] 关旭,马士华,应丹丰. 不确定条件下的多供应商-单制造商同步供货模型研究[J].机械工程学报, 2011.20
[22] 关旭,马士华. 产品单生产周期的多阶段融资和采购决策研究[J].管理科学, 2011.06
[23] 马士华,关旭. 第三方资金流提供商的采购协同问题研究[J].工业工程与管理,2009.03
五、科研项目(在研):
[1] 国家自然科学基金青年项目:基于消费特征识别的产品信息获取与披露联动决策研究,主持人,23万元,2015-2017
[2] 教育部人文社科基金项目,非对称信息下装配系统协同供货决策模型与方法研究,主持人,8万元,2015-2017
[3] 中国博士后基金资助项目(面上+特别),不对称渠道权力下装配系统博弈与合作策略研究,主持人,20万元,2013-2015:
[4] 武汉市软科学项目, 武汉高技术服务业重点技术需求调查研究,主持人,4万元,2015-2016
六、联系方式
电子邮箱:gavinguan@whu.edu.cn; dageguan@gmail.com; 联系电话:+86-27-68753139.
办公室:www.365808.comA-412.